April 10, 2022
Marcap receives the holy month of Ramadan with gratitude and surrendering hearts. As we witness the world rising from the impact of the global health crisis, we look forward with hope for a brighter future and we welcome to our fleet M/V Marcap 203.
Marcap 203 is driven by 7000 brake horsepower engines and 90T Bollard Pull. This 65-meter DP2 vessel is set to serve our biggest and main client in Abu Dhabi - ADNOC. She will be working offshore alongside our existing vessels to support Oil and Gas operations in the UAE. She is being prepared to commence the service and raise the flag of Marcap for at least five years.
With the resistance of our team to all challenges and by the leadership of our humble President & CEO, Marcap is continuing to grow and reach higher horizons and peaks.
Abu Dhabi, United Arab Emirates
Lulu Street, Safar Travel Building
3rd Floor, P.O Box 30175
Tel: +971 2 622 5100
Email: info@marcap.ae
Kingdom of Saudi Arabia,
Al Khubar
34226 - 6700, Unit No 108
Tel: +966 13 859 1972
Email: info@saudimarcap.com